- Chimney Rebuild
Complete Chimney Stack Rebuild and Masonry Restoration
A severely deteriorated rooftop chimney stack was dismantled to a sound base and rebuilt in new red brick, with a new crown and a stainless steel cap.
Our Work
Fireplace reconstructions, chimney rebuilds, liners, crowns and venting systems, built by our own crews for homeowners and property managers across the five boroughs and Long Island.
A severely deteriorated rooftop chimney stack was dismantled to a sound base and rebuilt in new red brick, with a new crown and a stainless steel cap.
A new masonry fireplace built to the project plans, with a custom firebrick firebox, smoke chamber and an offset connection into a Class A insulated chimney.
A decommissioned fireplace in a historic brownstone brought back to life with a new firebrick firebox, rebuilt masonry and a reinstalled stainless steel liner.
A failing chimney with crumbling mortar, damaged brick and a broken crown, fully dismantled and rebuilt with a new concrete crown, cap and weather-sealed base.
The deteriorated fireplace opening of a Park Slope brownstone rebuilt into a properly constructed, working fireplace with a new firebrick firebox.
A brand-new masonry fireplace and smoke chamber built from the ground up as part of a full house renovation on Staten Island.
A stainless steel liner routed through the existing masonry chimney of a wood-burning fireplace, creating a continuous, durable flue.
A dedicated stainless steel chimney for an oil-fired generator, routed up the exterior wall and terminated above the roofline.
A new weather-resistant crown, an extended clay flue and a stainless steel cap to keep water, debris and animals out of the chimney.
A rooftop chimney exhaust fan paired with a variable-speed control, so the homeowner can dial in the draft from inside the house.
A rooftop chimney exhaust fan with its own electrical supply line, run in weather-resistant conduit and mounted cleanly to the masonry.
A new steel support system built under the fireplace opening to carry the weight of the new hearth, firebox and finished masonry.
Tell us what the building needs. We look at the site, size the system, and come back with an engineered proposal within 48 hours.
Request a Quote